Use our free estimate generator to give customers an approximate price for construction, repairs, cleaning, painting, computer services or freelance work.
Enter your labor charges, materials and other expenses. Prepare a professional job estimate and save it as a PDF without signing up.
Create your estimate
Enter your own rates, optional work and payment terms.
Estimate preview
Free job estimate templates
- General job estimate: PDF Word Excel
- Construction estimate: PDF Word Excel
- Painting estimate: PDF Word Excel
- Cleaning estimate: PDF Word Excel
- Plumbing estimate: PDF Word Excel
- Electrical estimate: PDF Word Excel
- Landscaping estimate: PDF Word Excel
- HVAC estimate: PDF Word Excel
- IT service estimate: PDF Word Excel
- Freelance and consulting estimate: PDF Word Excel
Drafts are stored in this browser. Keep a backup. The deposit is proposed, not a payment receipt.
Open original estimate generator (including previous saved documents and branding)
Loading document generator…
How to create a job estimate online
- Enter your business and customer details, including the job address.
- Assign an estimate number, issue date and expiry date.
- List the work, materials, quantities and rates you expect to charge.
- Include discounts, applicable taxes and any separately identified allowances.
- Describe the scope, exclusions, estimated schedule and payment terms.
- Review the estimate, save it as a PDF and send it to the customer.
What should a professional estimate include?
| Field | What to include |
|---|---|
| Business and customer | Names, contact details and job address |
| Estimate reference | Number, issue date and validity date |
| Scope of work | Tasks, materials, quantities and deliverables |
| Prices | Labor rates, materials, discounts and applicable taxes |
| Assumptions | Conditions that may affect the final price |
| Schedule | Expected start and completion dates |
| Payment terms | Proposed deposit and payment milestones |
| Approval | How the customer accepts the work and approves changes |
If you offer optional work, show its price separately. Make it clear whether the optional work is included in the estimated total.
How to estimate labor and material costs
Find out exactly what the customer needs. Measure the area or quantities, obtain supplier prices and estimate the worker-hours required.
Suppose two workers cost you $25 an hour each and need four hours to complete the job. Your direct labor cost is $200.
Add $150 for materials and $50 for travel and overhead. Your total cost is $400. To earn a 20% margin, charge $500 before selling fees and applicable tax.
Use our service pricing calculator to calculate your selling rates. Enter customer-facing prices rather than your internal costs in the estimate.
Include time for preparation, travel and cleanup. If you need rented equipment or subcontractors, obtain their prices before finalizing your estimate.
Job estimate examples by industry
These examples use illustrative selling rates, not market averages. Replace them with your own rates and the actual work requirements.
| Job | Example charges | Estimated total before tax |
|---|---|---|
| Painting | 12 hours at $45, paint $160, supplies $50 | $750 |
| Cleaning | 4 hours at $45, supplies $20 | $200 |
| Computer installation | 3 hours at $80, accessories $60 | $300 |
| Landscaping | 8 hours at $50, plants $200, disposal $50 | $650 |
| Freelance design | 10 hours at $60, licensed assets $50 | $650 |
For painting, measure the surface and include preparation, coats and paint coverage. For cleaning, specify the rooms, frequency and tasks included.
For construction, separate labor, materials, equipment, subcontractors and permits. Get current supplier quotes for materials with fluctuating prices.
For freelance projects, specify the deliverables and revisions included. Charge separately for work outside the agreed scope if the customer approves it.
How to estimate a job when you don’t know the final cost
Give the customer a realistic price range when you cannot determine the amount of work before starting.
Suppose a plumbing repair requires two to four hours at $75 an hour. You expect to spend $50 to $100 on parts and $30 on travel.
| Expense | Minimum | Maximum |
|---|---|---|
| Labor | $150 | $300 |
| Materials | $50 | $100 |
| Travel | $30 | $30 |
| Estimated total before tax | $230 | $430 |
Explain which conditions could increase the cost. In this example, the final charge depends on how long the repair takes and which parts need replacement.
If you expect to use $500 of materials but prices are uncertain, a 10% allowance adds $50. Choose an allowance based on the actual uncertainty.
Avoid including the same potential expense in both a price range and a contingency allowance.
How to calculate a deposit and payment schedule
A deposit can help you pay for materials or reserve time for the job. Agree on its amount, purpose and refund terms before work begins.
For a $2,000 job, a 10% proposed deposit is $200. If the final agreed price stays $2,000, the remaining balance after payment is $1,800.
For larger projects, agree on payments at defined milestones, such as material delivery, installation and completion.
Deposit limits vary by jurisdiction. California’s Contractors State License Board generally limits down payments on covered home improvement contracts to 10% or $1,000, whichever is less, excluding finance charges.
A covered $15,000 project would generally have a $1,000 down payment limit. Check applicable rules and exceptions before requesting a deposit.
A proposed deposit isn’t money received. When a customer actually pays, use our receipt generator to acknowledge the payment.
Estimate vs. quote vs. bid vs. invoice
| Document | Purpose |
|---|---|
| Estimate | Approximate price based on available information |
| Quotation | Offered price for a defined scope |
| Bid | Offer submitted when competing for a project |
| Proposal | Solution, deliverables and commercial terms |
| Invoice | Request for payment |
Use our quotation generator when you can offer a defined price. An accepted estimate or quotation may create contractual obligations depending on the terms and local law.
Can a contractor charge more than the estimate?
An estimate is usually an approximation, not permission to increase a price without limit. Explain any additional work or cost as soon as you identify it.
Get the customer’s approval in writing before proceeding. Some jurisdictions impose specific notice requirements or limits, especially for consumer and home improvement contracts.
For a revised estimate, keep the original estimate number, add a revision number and describe what changed. Retain both versions.
Should you charge for preparing an estimate?
You can provide a free estimate for straightforward work when the preparation takes little time.
For jobs requiring diagnostic tests, detailed inspections, measurements or substantial travel, consider an agreed estimate fee. Tell the customer about the fee before starting.
You may also offer to credit that fee toward the final job if the customer proceeds. Record the arrangement in writing.
Does an estimate need a signature?
A signature can record the customer’s approval of the scope and estimated price. Whether a signature or formal contract is required depends on the transaction and applicable law.
For projects that require a written contract, use a compliant agreement rather than relying on an estimate alone.
How long should a job estimate be valid?
For routine jobs, 15 to 30 days can be a useful starting point. Choose a shorter period when materials or subcontractor rates change frequently.
Show the expiry date and review the prices if the customer accepts after that date.
How to create an estimate in Excel or Word
In Excel or Google Sheets, enter each task, quantity and selling rate in separate columns. Multiply quantity by rate and sum the line amounts.
If quantities are in C2 through C10 and unit prices are in D2 through D10, use =C2*D2 in E2. Copy the formula down.
Use =SUM(E2:E10) for the subtotal. Add applicable taxes and allowances separately, and exclude optional work the customer hasn’t selected.
In Word, insert a table for the work and prices. Add the scope, assumptions, payment schedule and space for approval.
How to revise or turn an estimate into an invoice
After the customer approves the work, confirm any changes to quantities, rates and scope. Keep the approved version and any written change approvals.
When payment becomes due, enter the final agreed charges in our invoice generator. Reference the estimate and deduct only deposits actually received.
Save your business and customer details for repeat estimates. Keep an editable backup and a copy of each document you send.